icon_CloudMgmt icon_DollarSign icon_Globe icon_ITAuto icon_ITOps icon_ITSMgmt icon_Mainframe icon_MyIT icon_Ribbon icon_Star icon_User icon_Users icon_VideoPlay icon_Workload icon_caution icon_close s-chevronLeft s-chevronRight s-chevronThinRight s-chevronThinRight s-chevronThinLeft s-chevronThinLeft s-trophy s-chevronDown

BMC Action Request System Migration Service – Customer Built Applications Only

123 + CREDITS

This Service migrates the Customer’s existing custom On-Premise Remedy ARS application to the latest BMC Helix ITSM platform. 

What you get:

BMC will perform the following:

Analyze and Design

  • Identify and document Non-standard Configurations* and Non-standard Integrations*
  • Prepare Migration Design Document

Prepare for Migration

  • Conduct walkthrough of the migration process
  • Install BMC Helix Data Manager (HDM) in Customer’s environment
  • Run HDM discovery and data mapping
  • Prepare Go Live Cut Over / Deployment Plan

Migrate and Test

  • Transform* BMC Action Request System (ARS) app related Foundation Data*, Application Data*, reporting (excluding BMC Smart Reporting), and transactional data
  • Migrate customer-built code and transform, as needed
  • Migrate Standard Configurations* and Standard Integrations*
  • Repoint existing Standard Integrations on the target system to the BMC Helix ITSM platform
  • Perform Unit Testing
  • Assist Customer with System Testing and Integration Testing for up to three weeks (for Standard Testing Support*)
  • Migration and testing will be performed on quality assurance or pre-production environments

Final Cut-over and Post-Production Assistance:

  • Execute final cut-over as documented in the Go Live Cutover Plan
  • Provide post-production assistance for up to one week

Customer will be responsible for:

  • Provisioning an On-Premise environment to install HDM and host a copy of the required databases
  • Provisioning On-Premise client gateway servers to facilitate connectivity between Customer’s On-Premise systems and Helix System
  • Configuring the staging database (DB) in Customer’s environment
  • Restoring a copy of Customer’s production DB on Customer’s staging DB
  • Providing access to BMC consultants to Customer’s BMC Remedy ITSM On-Premise staging environment
  • Providing a fast, reliable connection from the On-Premise staging server to the Helix FTP server
  • Performing System, Integration, and functional testing
  • Adhering to temporary code or configuration freeze as recommended by the BMC Project Team
  • Providing an application subject matter expert (SME) with a good knowledge of Customer’s Advanced Configurations and integrations.
  • Providing SME for any integrated applications to perform repointing of integrations and assisting with Unit Testing
  • Migrating and remediating Non-standard Customizations, Configurations, and Non-standard Integrations
  • Applying fixes to Standard Configurations and Standard Integrations for non-migration related issues identified during user functional testing
  • Ensuring that standard integrations include AR API, Web Service and Rest API
  • Preparing data load sheets as per BMC standard guidelines

Project Milestones: The following Milestones are established between the Customer and BMC. Once BMC has reached a milestone, the BMC project manager will issue a milestone completion letter to the Customer.

  • Milestone 1: Upon delivery of the Project Schedule
  • Milestone 2: Upon delivery and approval of the Migration Design Document
  • Milestone 3: Upon delivery and approval of the Go Live Cutover Plan
  • Milestone 4: Upon completion of the Project Closeout meeting and the delivery of the project completion letter
Delivery Options Success Credits Required
Standard Delivery*
123
Standard Delivery Country Specific Staffing*  
210

 

Deliverables: Using BMC’s standard methodology and templates, the following Deliverables are in scope for this project and will be delivered:

  • Project Schedule
  • Project Status Report
  • Migration Design Document
  • Go Live Cutover Plan

Completion Criteria: BMC will have completed these Consulting Services when the in-scope Consulting Services have been completed and the Deliverables have been delivered to the Customer Project Manager.

Pre-requisites:

  • Customer’s On-Premise BMC products:
    • BMC Remedy ARSystem version is 20.02 or later
    • Customer’s On-Premise database is Microsoft SQL Server or Oracle
  • BMC Remedy Action Request System applications only to be migrated Only applications
  • No data integrity issues in the Customer’s environment
  • Workflows must be reconciled to suit the target environment
  • ARS application database size is less than 3 TB
  • Additional information:

  • Estimated Duration: Up to 16 weeks
  • In-scope Product: BMC Helix ITSM
  • Service Type: Deployment
  • Availability: Active
  • Success Service Code:
    • ARS_MIGR_001_OFFSHORE
    • ARS_MIGR_001_ONSHORE
  • Date Last Updated: 12/4/2024

Definitions

Getting Started Is Easy

Service Highlights..